Featuring 176 DERM concrete modules, this reef was installed on May 30, 1999, at 68 feet depth with 5-foot relief. It contributes to the Bal Harbor reef system and offers excellent conditions for diving and marine observation.
Featuring 176 DERM concrete modules, this reef was installed on May 30, 1999, at 68 feet depth with 5-foot relief. It contributes to the Bal Harbor reef system and offers excellent conditions for diving and marine observation.
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.